It is recommended to pour 2 of concrete over the depth of deck for a minimum total slab depth of 3 5 when using this deck.
1 5 20 ga metal deck.
Available in 20 gauge galvanized at 1 5 x 1 5 1 x 2 1 x 3 shop now.
1 5b nested deck used with sidelap screws 1 5bi interlocking deck used with tsws or bps 1 5plb interlocking deck used with punchlok ii system approximate dimensions 1 5b 1 5bi 1 5plb roof deck imperial standard features astm a653 a653m ss gr 50 minimum steel with fy 50 ksi.
It is recommended to pour a minimum of 2 of concrete over the ribs of the deck for a total slab thickness of 5.
Type b roof deck is 1 5 deep.
1 5 vl composite metal floor deck is typically used for multi story buildings mezzanines bridge walkways porches in fills platforms and parking garages storage facilities etc.
The thicker the steel the more the metal deck is going to cost.
This will prevent concrete spilling through ends of the metal deck.
Depending on the profile type we carry the following gauges.
Type b wide rib deck provides excellent structural load carrying capacity per pound of steel utilized and its nestable design eliminates the need for die set ends.
With metal deck the smaller the gauge number the thicker the steel.
These formed galvanized angles are used to create a stopping point for poured concrete.
1 5 steel form deck is a versatile product.
6 0 to 42 0 ulc listing.
Metal deck supply provides 1 1 2 composite floor deck 1 1 2 composite floor deck 1 5 composite floor deck 1 1 2 composite floor decking 1 1 2.
16 gauge galvanized in stock.
20 ga 18 ga 16 ga.
1 5 vl composite steel floor deck has a ribbed profile with embossments designed to interlock with concrete slabs creating a reinforced concrete slab that serves the dual purpose of permanent.
Hsb 36 is good in stock in the following gauges 22 20 18 16 gauge.
1 5 b deck s wider rib profile allows for more insulation to be installed.
In addition b roof deck is available in lengths ranging from 6 2 to 35 6.
Edge form and pour stop immediate availability and delivery.
3 composite metal deck requires more concrete but spans greater distances than shallower composite metal decking.
So what this means is 16 gauge is thicker than 18 gauge and 18 gauge is thicker than 20 gauge.
3 weeks based on material availability.